Image Gallery

  •  
Project map

Gallery: Hydrogeological Drilling

Dewatering pumping rates have been established during the DFS and APFS studies by observing flow rates and draw down cones from a series of 13” cased boreholes. Pumping tests lasting over seven days were conducted on each location.

hydrogeology_4 hydrogeology_5 hydrogeology_2 hydrogeology_3 hydrogeology_8 hydrogeology_1 hydrogeology_6 hydrogeology_7 hydro view